نمونه سوال درس زبان تخصصی رشته مهندسی مدیریت پروژه نیمسال دوم 93-92
بیست فایل

نمونه سوال درس زبان تخصصی رشته مهندسی مدیریت پروژه نیمسال دوم 93-92

Current View
counter free hit unique web
دیگر مطالب مرتبط
مطالب مرتبط
متن نوشتاری این نمونه سوال


= دانشگاه پیام نور کارشناسی مرکز آزمون و سنجش
.
حضرت علی(ع): دانش راهبر نیکویی برای ایمان است
تعداد سوالات : تستی : ۳۰ تشریحی : ۰ زمان آزمون (دقیقه) : تستی : ۱۲۰ تشریحی : ۰ سری سوال : یک ۱ عن-وان درس : زبان تخصصی
رشته تحصیلی / کد درس : مهندسی مدیریت پروژه ۱۲۱۲۱۶۳
1-Which one is not an obvious outcome of project management?
1 completion on the date agreed with the customer
2. completion within the desired cost
3 meeting standards of quality
4. accomplishment of the project
2-Glass was used to ......... many of these new buildings
1. clad 2, found 3. cast 4 frame
3-Which one used marble and limestone in construction of temples?
1. The Greeks * The Egyptians 3. The Romans 4. Europeans
4-When there was a construction boom around the world?
1. after World War II 2. during the late 1800s
9 during Industrial Revolution 4. after the Roman Empire
5-Which one is not among the three primary balancing factors of a project?
1. Time 2. Technology 3. Quality 4. Money
6-The management of construction projects requires........... of modern management.
1. Energy 2. Resources 3. Knowledge 4. Design
7-A very rigorous price bidding means: 1. а very easy competition 2. A very close competition 3. A predictable bidding 4. A fraud bidding
8-Which of the following has the closest meaning to “Certain Regulations”?
1. Rules which are absolutely correct * Pre-defined rules
3. Flawless regulations 4. Rules which are not usually trustable
9-"It is Imperative to ...." means
1. It is not necessary to ... * Crucially it is needed to...
3. It is easy to ... 4. Usually it is required to ...
10-Project Management is planning from ........ to completion
1 control * undertaking 3, inception 4. medium
11-The regulations help home-owners to do their ....... safely.
1. Legislation 2. Obligation 3. Estimation 4. Renovation
1010/10102O398
نیمسال دوم ۹۳-۱۳۹۲ صفحه ۱ از ۳
























































***
= دانشگاه پیام نور کارشناسی مرکز آزمون و سنجش
.
حضرت علی(ع): دانش راهبر نیکویی برای ایمان است
تعداد سوالات : تستی : ۳۰ تشریحی : ۰ زمان آزمون (دقیقه) : تستی : ۱۲۰ تشریحی : ۰ سری سوال : یک ۱ عن-وان درس : زبان تخصصی
رشته تحصیلی / کد درس : مهندسی مدیریت پروژه ۱۲۱۲۱۶۳
12-Feasibility deals with converting an idea to a ...... product
1. Ex ante 2. Positive 3. Tangible 4. Profitable
13-When the completion date of a project is forthcoming, it means that
1. It is likely to finish it with force 2. It is expected to finish it very soon
3. It cannot be completed 4. It should be restarted after finishing
14-What does "contingency" mean?
1 confidence 2. pollution 3. containing 4. possibility
15-The result of structural analysis will be converted into ....
1. Feasibility studies * Drawings
3. Bidding documents 4. External works
16-What aspect of design elaborates on beauty?
1. Asthmatic * Agnostic 3. Asthenic 4. Aesthetic
17-When something is practicable it means that.....
1. it is implementable 2. it is potential to be designed
3. it is conceptual 4. it is basically not applicable
18-One the objectives of earthquake engineering is foreseeing the potential...... of strong earthquakes on cities.
1. Effects 2. Behavior 3. Loads 4. Risks
19-Earthquake engineering is the scientific field concerned with ......... society.
1. Seismic 2. Protecting 3. Loading 4. Geotechnical
20-Which one cannot be used as a member of structural system?
1. reinforced concrete 2. steel
3 plaster 4. timber
21-What do valves with spouts make?
1. Faucet 2. Water closet 3. Laundry trays 4. Lavatories
22-What is the closest word to pedestal?
1 column 2. bridge 3 beam 4. timber
1010/10102O398
نیمسال دوم ۹۳-۱۳۹۲ صفحه ۲ از ۳

























































***
= دانشگاه پیام نور کارشناسی مرکز آزمون و سنجش
.
حضرت علی(ع): دانش راهبر نیکویی برای ایمان است
تعداد سوالات : تستی : ۳۰ تشریحی : ۰ زمان آزمون (دقیقه) : تستی : ۱۲۰ تشریحی : ۰ سری سوال : یک ۱ عن-وان درس : زبان تخصصی
رشته تحصیلی / کد درس : مهندسی مدیریت پروژه ۱۲۱۲۱۶۳
23-To hammer out something means: 1. to break something out * to divide things into useless parts
3. to develop something into details * to transform things to another thing
24-What is the most important disadvantage of Bar Charts? 1. They are complex. * They are not simple and easy to understand. 3. They cannot show interrelationships very clear.
* They cannot show when the activities end and begin.
25-What is a synonym for "incipient"?
1. starting 2. meddling 3. finishing 4. eradication
26-What does "egress" mean? 1. View 2. Exit 3. Input 4. Outdoor
27-What does "delineated" mean?
1. erased 2 drawn 3. added 4. mixed
28-Which method does not consider qualifications of the contractor? 1. OBS 2. Best Value Selection 3. Low Bid Selection 4. All of them
29-What is a "statutory requirement?" 1. A preliminary design 2. A legal permission
3. A constitutional matter * A risk analysis
30-What is the minimum size of a coarse-grained soil?
1. 0.2 mm 2 0.6 mm 3. 0.02 mm 4. 0.06 mm